检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈娟 潘倍强 CHEN Juan;PAN Bei-qiang(CRRC Zhuzhou Locomotive Co.,Ltd.,Zhuzhou 412001;National Key Laboratory of Heavy duty Fast and High power Electric locomotive,Zhuzhou 412001)
机构地区:[1]中车株洲电力机车有限公司,株洲412001 [2]重载快捷大功率电力机车全国重点实验室,株洲412001
出 处:《环境技术》2023年第10期129-135,共7页Environmental Technology
摘 要:本文主要结合电磁兼容理论、规范标准和建模仿真对地铁的EMC布局布线进行仿真分析,首先,分析电磁干扰对于系统、设备、的影响和危害,阐述保证电磁兼容可靠的必要性,其次,对地铁牵引辅助和供风制动两大最为关键的系统进行了EMC风险分析,对每个系统中容易产生电磁兼容问题的高危风险点进行分析和评估,给出了恰当的解决措施,最后,根据地铁列车布局布线规则和标准,结合地铁车辆的实际情况,分别针对于车上、车内、车下、电气柜和线槽等关键位置,易产生干扰问题的部分进行仿真和布线设计,从布局布线角度降低这些位置电磁兼容问题产生的可能性,进而保证地铁列车的正常运行。This paper mainly combines electromagnetic compatibility theory,specifications and modeling and simulation to conduct simulation analysis of subway EMC layout and wiring.First,it analyzes the impact and harm of electromagnetic interference on systems and equipment,and expounds the necessity of ensuring the reliability of electromagnetic compatibility.Secondly,EMC risk analysis is carried out on the two most critical systems of subway traction assistance and wind supply brake.The high-risk risk points that are prone to electromagnetic compatibility problems in each system are analyzed and evaluated,and appropriate solutions are given.Finally,according to the rules and standards of subway train layout and wiring,combined with the actual situation of subway vehicles,simulation and wiring design are carried out for the parts that are prone to interference problems at key locations such as on-board,in-car,off-car,electric cabinet and cable trough,respectively.From the perspective of layout and wiring,the possibility of electromagnetic compatibility problems in these locations can be reduced to ensure the normal operation of subway trains.
分 类 号:U28[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7