检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔺再强 LIN Zaiqiang(China Railway Construction Group Co.,Ltd.,Beijing 100043,China)
出 处:《工程质量》2023年第11期91-96,共6页Construction Quality
摘 要:随着我国高速铁路的快速发展,高铁站房建设体量庞大,在高铁站房高架层行驶汽车吊并进行构件吊装作业是常见情况,且难度较大。结合广深港高铁虎门站站房改扩建项目作业需求,提出了一种适用于此类工程的临时加固方式,通过组合支撑架将竖向荷载部分传递至下层,给出了基于影响线的计算方法。采用该方法对虎门站高架层组合支撑架进行了设计,并对楼板、主次梁、支撑架等进行了计算,给出了满足各作业工况要求的临时加固方案。With the rapid development of China's high-speed railway,the construction volume of high-speed railway stations is huge.It is common and difficult to drive truck crane and lifting components on the elevated floor.In combination with the operation requirements of the Guangzhou-Shenzhen-Hong Kong High-speed Railway Humen Station Renovation and Expansion project,a temporary strengthening method was proposed,which transferred part of the vertical load to the lower layer by composite shoring scaffold.And the calculation method of based on influence line was put forward.Using this method,the composite shoring scaffold of Humen station was designed,the bearing capacity of the slabs,primary and secondary beams and shoring scaffold are calculated.A temporary strengthening scheme that can meet the requirements of various operating conditions was provided.
分 类 号:TU745.5[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49