检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁飞 张瑞永 朱亚鹏 郑擎天 YUAN Fei;ZHANG Ruiyong;ZHU Yapeng;ZHENG Qingtian(China Energy Engineering Group Jiangsu Electric Power Design Institute Co.,Ltd.,Nanjing 211100,China)
机构地区:[1]中国能源建设集团江苏省电力设计院有限公司,江苏南京211100
出 处:《电力勘测设计》2023年第11期79-86,共8页Electric Power Survey & Design
摘 要:为持续提升特高压线路工程设计水平,加快推进三维设计示范应用,梳理各阶段、各专业三维正向设计协同作业流程,同时制定三维正向设计控制与校审流程,保证三维设计和出图的质量。同时将BIM三维正向设计应用于勘测、设计、施工、移交、运维各阶段,并取得成效。提高线路工程的设计质量和效率,推动特高压数字化成果在项目全寿命周期内的综合应用。In order to continuously improve the design level of UHV line engineering,and accelerate the promotion of 3D design demonstration application,the collaborative process of 3D positive design in various stages and disciplines has been combed,and the 3D positive design control and review process has been developed to ensure the quality of 3D design and drawing.At the same time,BIM 3D forward design was applied to survey、design、construction、handover、operation and maintenance,and achieved results.The design quality and efficiency of the line engineering have been improved,and the comprehensive application of UHV digital achievements in the whole life cycle of the project has been promoted.
关 键 词:BIM技术 三维正向设计 特高压线路管理 数字化建设
分 类 号:TM72[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200