检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Meng HUANG Mingli HUANG Ze YANG Yuan SONG Zhien ZHANG
机构地区:[1]School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China [2]Enterprise Key Laboratory,Tianjin Municipal Engineering Design and Research Institute,Tianjin 300392,China [3]School of Civil Engineering and Architecture,Anhui University of Science and Technology,Huainan 232001,China
出 处:《Frontiers of Structural and Civil Engineering》2023年第8期1249-1263,共15页结构与土木工程前沿(英文版)
基 金:the General Program of the National Natural Science Foundation of China(Grant No.51878037).
摘 要:Model tests and numerical calculations were adopted based on the New Yuanliangshan tunnel project to investigate the water pressure resistance of lining construction joints in high-pressure and water-rich karst tunnels.A large-scale model test was designed and conducted,innovatively transforming the external water pressure of the lining construction joint into internal water pressure.The effects of the embedded position and waterstop type on the water pressure resistance of the construction joint were analyzed,and the reliability of the model test was verified via numerical calculations.The results show that using waterstops can significantly improve the water pressure resistance of lining construction joints.The water pressure resistance of the lining construction joint is positively correlated with the lining thickness and embedded depth of the waterstop.In addition,the type of waterstop significantly influences the water pressure resistance of lining construction joints.The test results show that the water pressure resistance of the embedded transverse reinforced waterstop is similar to that of the steel plate waterstop,and both have more advantages than the rubber waterstop.The water pressure resistance of the construction joint determined via numerical calculations is similar to the model test results,indicating that the model test results have high accuracy and reliability.This study provides a reference for similar projects and has wide applications.
关 键 词:karst tunnel lining construction joint water pressure resistance large-scale model test numerical calculations
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229