检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张军 ZHANG Jun(FSDI Gansu Railway Comprehensive Engineering Survey Institute Co.,Ltd.,Lanzhou 730000,Gansu,China)
机构地区:[1]中铁一院甘肃铁道综合工程勘察院有限公司,甘肃兰州730000
出 处:《工程技术研究》2023年第19期202-204,共3页Engineering and Technological Research
摘 要:在新乌鞘岭隧道施工过程中,受极高地应力与复杂应力状态的影响,部分段落极易发生软岩大变形。文章通过分析新乌鞘岭隧道TSP超前地质预报高地应力段的围岩泊松比,提高对F7断层超前预报的可靠性、精确性,准确了解并反映隧道开挖面前方的地质情况,为隧道开挖预防软岩大变形提供了可靠的保障,降低了地质灾害发生的风险,进而指导隧道施工顺利进行,降低隧道施工风险。In the construction process of new Wushaoling Tunnel,some sections are prone to large deformation of soft rock due to the influence of extremely high crustal stress and complex stress state.By analyzing the Poisson's ratio of surrounding rock in high crustal stress section in new Wushaoling Tunnel's TSP advanced geological prediction,the reliability and accuracy of F7 fault advanced prediction are improved,and the geological situation in front of tunnel excavation face is accurately understood and reflected,providing a reliable guarantee for preventing large deformation of soft rock during tunnel excavation,reducing the risk of geological disasters,and then guiding the smooth progress of tunnel construction and reducing the risk of tunnel construction.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38