检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘金广 刘致远 LIU Jinguang;LIU Zhiyuan(Beijing Hengji Construction Engineering Co.,Ltd.,Beijing 100166,China)
机构地区:[1]北京恒基建筑工程有限公司,北京市100166
出 处:《建筑电气》2023年第11期55-59,共5页Building Electricity
摘 要:为解决GB50303-2015《建筑电气工程施工质量验收规范》和GB51348-2019《民用建筑电气设计标准》实施以来产生的设计与施工之间的问题,结合笔者30多年来的施工实践经验,提出沿桥架支架敷设镀锌扁钢是解决接地保护的最佳路径。并就此提出“沿桥架支架敷设镀锌扁钢作为保护接地体”便可使复杂且笼统的接地问题在设计与施工之间变得具体和可实迎刃而解之观点。In order to solve the problems oceurring in design and construction since the implementation of the Code for Acceptance of Construction Qualisy of Building Electrical Enginering(GB 50303-2015)and the Standard for Electrical Design of Cwvil Buildings(CB 51348-2019),this paper presents that galvanized flat steel laying along the cable tray is the best way for earthing protection according to the author's construction experience for more than 30 years.Meanwhile,it presents an idea that galvanized flat steel laying along the cable tray as a protective earth electrode can make complex and general earthing problems concrete and easily solved in design and construction.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.97.63