检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵丹[1] Zhao Dan(Changzhi Vocational and Technical College,Changzhi Shanxi 046000,China)
出 处:《山西冶金》2023年第10期73-74,共2页Shanxi Metallurgy
摘 要:通过采用新方法进行地下爆破实践,结果表明:在居民区附近的爆破产生了较低水平的振动,完全在可接受的范围内。在连续两个切割孔中间在两个连续的切割孔之间使用200~300 ms的延迟间隔,可获得良好的爆破效果。电子起爆系统产生的振动水平低于导爆管起爆系统产生的振动水平,振动级降低了12.5%。环形孔爆破时孔之间的延迟间隔为40 ms和80 ms,甲板之间的延迟间隔为20~80 ms,导致振动水平降低。数据表明,随着结构高度的增加,振动水平降低,频率高,结构振动水平降低,获得的碎片是最佳的。Through the use of new methods for underground blasting practice,the results show that blasting near residential areas has generated lower levels of vibration,which is completely within an acceptable range.Using a delay interval of 200~300 ms between two consecutive cutting holes can achieve good blasting results.The vibration level generated by the electronic initiation system is lower than that of the detonating tube initiation system,with a 12.5%reduction in vibration level.The delay interval between holes during circular hole blasting is 40 ms and 80 ms,and the delay interval between decks is 20~80 ms,resulting in a decrease in vibration levels.The data shows that as the height of the structure increases,the vibration level decreases.When the frequency is high,the vibration level of the structure decreases,and the obtained fragments are the best.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145