检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王宏伟 Wang Hongwei(Iron Making Plant of Laiwu Branch of Shandong Iron&Steel Co.,Ltd.,Jinan Shandong 271104,China)
机构地区:[1]山钢集团莱芜分公司炼铁厂,山东济南271104
出 处:《山西冶金》2023年第10期137-140,145,共5页Shanxi Metallurgy
摘 要:受钢铁市场低迷影响,炼铁厂6号高炉焖炉停产,随着外部市场变化,在焖炉12 d后复产,经过精心组织,参数调整,实现了高炉长期焖炉后快速达产。重点从送风前准备、装料工作、开炉操作三个方面对6号高炉长期焖炉后快速开炉达产实践过程予以阐述,并进行经验总结,以期为同类企业高炉生产提供借鉴。Due to the downturn in the steel market,the No.6 blast furnace of the ironmaking plant was shut down for soaking.With changes in the external market,it resumed production after 12 days of soaking.After careful organization and parameter adjustment,the blast furnace quickly reached production after long-term soaking.This article comprehensively elaborates on the practical process of rapid start-up and production of No.6 blast furnace after long-term soaking from prepartion before blowing-in,loading start-up.and summarizes the experience,in order to provide reference for similar enterprises in blast furnace production.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28