方家山核电厂并网时蒸汽发生器水位运行策略优化  

Optimization of the SG Level Operation Strategy during Connecting to the Grid of Fangjiashan Nuclear Power Plant

在线阅读下载全文

作  者:丁言锋 DING Yanfeng(Nuclear Power Operation Management Co.,Ltd.,CNNP,Haiyan,Zhejiang Prov.314303,China)

机构地区:[1]中核核电运行管理有限公司,浙江海盐314303

出  处:《中国核电》2023年第5期709-718,共10页China Nuclear Power

摘  要:方家山核电机组在并网过程中曾出现过给水调节阀开度突跳导致蒸汽发生器水位大幅度波动的现象。文中从蒸汽发生器水位控制原理出发,分析并网过程中给水调节阀开度波动原因,并经理论计算与模拟机验证,给出并网过程中避免给水调节阀开度突跳导致蒸汽发生器水位波动的有效解决方案。In the process of grid-connection of Fangjiashan Nuclear Power Plant,there had been a phenomenon that the opening of the feedwater regulating valve suddenly jumped higher,which caused the level of the steam generator fluctuating greatly.Starting from the principle of steam generator level regulation,this paper analyzes the causes of the opening fluctuation of the feedwater regulating valve during grid connection.And through theoretical calculations and full-scale simulator verification,this paper has provided an effective solution to avoid the steam generator level abnormal fluctuation caused by the sudden jump of the feed water regulating valve opening during grid connection.

关 键 词:蒸汽发生器 水位 给水调节阀 复制回路 偏置信号 

分 类 号:TM623[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象