检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:余勇[1] 陈焰周[1] 肖飞[1] 徐必兵 Yu Yong;Chen Yanzhou;Xiao Fei;Xu Bibing(Central South Architectural Design Institute Co.,Ltd.,Wuhan Hubei 430071,China)
机构地区:[1]中南建筑设计院股份有限公司,湖北武汉430071
出 处:《山西建筑》2023年第24期71-73,共3页Shanxi Architecture
摘 要:以合肥滨湖时代广场C2栋高层建筑为依托,对该栋建筑桩基础进行了设计,经过对拟建场地的土层情况、水文地质条件及场地与地基的地震效应的分析,并按照相关规范及评审专家意见,确定采用大直径挖孔扩底灌注桩基方案,经计算分析表明,大直径挖孔扩底灌注桩以桩端的端阻力为主,不考虑侧摩阻力。Based on C2 high-rise building of Binhu Times square in Hefei city,the paper designs the building pile foundation.Through analyzing proposed field soil condition,hydraulic condition,and seismic effect between the proposed field and the foundation,according to relevant norms and assessment experts proposals,it determines to adopts the scheme of large-diameter expanded-bottom cast-in-place pile.The calculating analysis shows that the large-diameter expanded-bottom cast-in-place pile takes the pile-end resistance as the orientation without considering the side-friction resistance.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.97.243