检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张洋 ZHANG Yang(Suzhou Erjian Construction Group Co.,Ltd.,Suzhou 215122,Jiangsu,China)
机构地区:[1]苏州二建建筑集团有限公司,江苏苏州215122
出 处:《建筑施工》2023年第11期2259-2261,共3页Building Construction
摘 要:为解决场地狭窄条件下的桥梁承台模板支设难题,提出一种承台混凝土反模板施工技术。通过在基坑内部采用大块整体钢模板浇筑形成混凝土胎模,结合拉森钢板桩作为承台基坑的支护结构,可有效抵抗土体侧压力,相比传统放坡开挖方案具有更高的安全性。依托实际项目案例,总结分析承台混凝土反模板施工工艺的具体流程与操作要点,并详细分析了方案实施的经济效益与工期效益,为类似场地狭窄条件下的桥梁承台施工提供了一种新的技术思路。In order to solve the problem of formwork support of bridge pile cap under narrow site conditions,a construction technology of concrete reverse formwork for pile caps is proposed.Large integral steel formwork is used to form concrete formwork inside the foundation pit,combined with Larsen steel sheet pile as the supporting structure of the foundation pit of the bearing platform,which can effectively resist the lateral pressure of the soil,and has higher safety than the traditional slope excavation scheme.Based on the actual project case,this paper summarized and analyzed the specific process and operation key points of pile cap concrete reverse formwork construction technology,and analyzed in detail the economic benefits and construction period benefits of scheme implementation,provided a new technical idea for bridge pile cap construction under similar narrow site conditions.
分 类 号:TU69[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90