检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘成群 魏岗 LIU Chengqun;WEI Gang(China Nuclear Industry Huaxing Construction Co.,Ltd.,Nanjing 210019,Jiangsu,China)
机构地区:[1]中国核工业华兴建设有限公司,江苏南京210019
出 处:《建筑施工》2023年第11期2318-2321,共4页Building Construction
摘 要:桥梁钢索塔施工是斜拉桥施工的关键工序,近年来“卧式拼装、整体竖转”的施工理念在国内得以推广应用,为适应不同工况衍生出了“提滑组合”的施工方法,通过“提滑组合”方式施工拱形钢索塔尚无先例,通过对陕西韩城太史大街西延桥质量2100 t、高117.5 m的拱形钢索塔提滑组合的施工技术进行研究,成功解决了超高超重拱形钢索塔的安装难题。The construction of steel pylon of bridge is a key process in the construction of cable-stayed bridge.In recent years,the construction concept of"horizontal assembly and integral vertical rotation"has been popularized and applied in China.In order to adapt to different working conditions,the construction method of"lifting-sliding combination"has been derived.There is no precedent for the construction of arched steel pylon by"lifting-sliding combination".Through the research on the lifting-sliding combination construction technology of the arched steel pylon with mass of 2100 t and height of 117.5 m of the west extension bridge of Taishi Street in Hancheng,Shaanxi Province,the installation problem of the super-high and super-heavy arched steel pylon is successfully solved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.251.50