检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:雷鹏 Lei Peng(China Railway 12th Bureau Group Second Engineering Co.Ltd.,Xinyang,Henan 030032)
机构地区:[1]中铁十二局集团第二工程有限公司,河南信阳030032
出 处:《江西建材》2023年第9期241-243,共3页Jiangxi Building Materials
摘 要:砂质不良地质结构会增加工程施工难度与风险,影响工程进度与质量。为有效应对砂质不良地质环境影响,隧道施工需做好勘察作业,并采取合适的处理措施。文中以万荣隧道工程为例,对砂质不良地质进行了分析,采取挑顶利用旋喷桩技术,降低砂质不良地质的影响,使隧道工程施工得以顺利进行。In engineering construction,the presence of poor sandy geological structures can increase the difficulty and risk of construction,affecting the progress and quality of the project.In order to effectively deal with the unfavorable geological environment of sandy soil,it is necessary to strengthen the investigation of unfavorable geological structures of sandy soil during tunnel construction,take appropriate treatment measures,and avoid the impact of unfavorable geological environment of sandy soil on construction.Therefore,in this study,the Wanrong Tunnel project was taken as a case study to analyze the adverse geological conditions of sandy soil,and the use of jet grouting pile technology was adopted to reduce the impact of adverse geological conditions of sandy soil,promoting the smooth development of the tunnel project.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38