检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周立福 陈伟 杨允岩 向凌晨 田灵毓 ZHOU Lifu;CHEN Wei;YANG Yunyan;XIANG Lingchen;TIAN Lingyu
出 处:《电力系统装备》2023年第11期169-171,共3页Electric Power System Equipment
摘 要:临时接地线是保证现场作业人员人身安全的安保线,而现有的临时接地线装设操作难度较大,费时费力,操作多组接地线后手臂会发酸、乏力,甚至会出现手抖动现象,给后续操作带来了不安全因素。为此文章总结了国内外各种接地线成套装置的结构特点,提出通过弹簧储能原理,设计制作纯机械结构、操作简易的接地线、接地头及配套操作杆。并进行相应的结构设计及试验效果验证,结果证明,弹簧储能式的成套接地线装置可降低操作难度,缩短安装时间。Temporary grounding wire is a safety line that guarantees the personal safety of on-site workers.However,the existing temporary grounding wire installation is difficult,time-consuming and laborious.After operating multiple sets of grounding wires,the arms will become sore,weak,and even trembling,which brings unsafe factors to subsequent operations.Therefore,this article summarizes the structural characteristics of various grounding wire complete devices at home and abroad,proposes a spring energy storage principle,and designs and manufactures a purely mechanical structure of easy-to-operate grounding wire heads and matching operating rods.Corresponding structural design and test effect verification were carried out.The results showed that the spring energy storage type complete grounding wire can reduce operating difficulties and shorten installation time.
分 类 号:TM76[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.147.65