检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵乐 陈希 韦静林 方万刚 柳印生 Zhao Le;Chen Xi;Wei Jing-lin;Fang Wan-gang;Liu Yin-sheng
机构地区:[1]中国建筑第二工程局有限公司华南分公司,广东深圳518048
出 处:《建筑技术开发》2023年第12期26-28,共3页Building Technology Development
摘 要:高层建筑主体结构施工外立面防护大多选用全封闭整体附着式升降脚手架,但在层层内收的超高层建筑施工时,该类架体存在诸多安全隐患。通过对内收型超高层建筑电动爬架的研究,提出了分片式附着式升降脚手架,成功降低了常规架体在内收型建筑提升过程产生内部挤压力的风险,减少了施工过程中的安全隐患。The facade protection of the main structure of high-rise buildings is mostly used completely enclosed integral attached lifting scaffolding,but in the construction of the superhigh-rise buildings with layers of adduction,this kind of scaffolding has many safety risks.Based on the research of electric climbing frame of the introtractive super high-rise building,a segmental attached lifting scaffold is proposed,which successfully solves the internal extrusion pressure risk of the conventional frame in the lifting process of the introtractive building,and reduces the hidden danger in the construction process.
关 键 词:超高层 内收型 分片式附着式升降脚手架 提升挂座 板式支座
分 类 号:TU974[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200