检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶洪波 Ye Hong-bo
机构地区:[1]河南省交通规划设计研究院股份有限公司,郑州450000
出 处:《建筑技术开发》2023年第12期82-84,共3页Building Technology Development
摘 要:研究对郑州至洛阳高速公路龙门枢纽互通式立交内C匝道桥的施工过程进行了深入研究。针对该工程特点,选择了顶推施工方法进行钢箱梁的施工。通过设计合理的桥墩结构,选择正确的顶推设备,以及设置全面的安全保障措施,保证了施工的顺利进行。在设计中,特别考虑了钢梁横坡、路线半径、桥墩与路线前进方向交角等因素的影响,以满足施工的需要。In this study,the construction process of C-ramp bridge in the interchange of Longmen Junction of Zhengzhou to Luoyang expressway is deeply studied.According to the characteristics of the project,the jacking construction method is selected for the construction of steel box girder.The construction can be carried out smoothly by designing reasonable pier structure,selecting correct pushing equipment and setting up comprehensive safety measures.In the design,the influence of the transverse slope of the steel beam,the radius of the route,the intersection Angle between the pier and the direction of the route is especially considered to meet the needs of construction.
分 类 号:U445.462[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.157.139