检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯学彤 FENG Xuetong(Second Mine,Shanxi Huayang Group New Energy Co.,Ltd.,Yangquan,Shanxi 045000,China)
机构地区:[1]山西华阳集团新能股份有限公司二矿,山西阳泉045000
出 处:《自动化应用》2023年第22期23-24,共2页Automation Application
摘 要:为实现某矿巷道的快速掘进,本文在分析工作面地质条件的基础上,通过施工技术层面的理论计算优化支护参数,优化后的支护方案在100 m巷道的掘进中可节约500根锚杆的成本,缩短钻眼时间60 h;在机械配套方面采用凿岩机替代风钻,钻眼速度提升2.5倍;采用综合掘进技术后,工作面进尺每月可由原100 m提升至150 m。In order to achieve rapid excavation of a certain mine roadway,this paper analyzes the geological conditions of the working face and optimizes the support parameters through theoretical calculations at the construction technology level.The optimized support plan can save the cost of 500 anchor rods in the excavation of a 100 m roadway and shorten drilling time by 60 h.In terms of mechanical support,rock drlls are used instead of pneumatic drills,which increases the drilling speed by 2.5 times.After adopting comprehensive excavation technology,the monthly footage of the working face can be increased from 100 m to 150 m.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.141.114