检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:白波 刘舜 董鹏 胡健 Bai Bo;Liu Shun;Dong Peng;Hu Jian(China Mobile Communications Group Design Institute Co.,Ltd.Heilongjiang Branch,Harbin 150000,China)
机构地区:[1]中国移动通信集团设计院有限公司黑龙江分公司,黑龙江哈尔滨150000
出 处:《电子技术应用》2023年第12期60-64,共5页Application of Electronic Technique
摘 要:现阶段,通信基站基础设施缺乏主动规划,存在多套设施叠加建设;电源、备电、空间不匹配,运营缺乏精细化管理,无效能耗高,系统运行效率低;运维尚未实现智能运维,效率低下且成本高,缺乏对设备的全生命周期管理和评价。面向碳达峰、碳中和愿景目标,研究基于三大能效指标,采用面向“低碳”目标网整体规划的全场景、全生命周期逻辑集成式规划方法,围绕基站和机房构筑全场景全生命周期低碳,向绿色低碳基础设施目标持续演进的规划方法,从而为实现综合能耗持续降低,促进经济社会的全面绿色低碳转型发展提供有力支撑。At this stage,there is a lack of active planning of communication base station infrastructure,and there are multiple sets of superimposed facilities.The power supply,backup power and space are not matched,the operation lacks refined manage-ment,the ineffective energy consumption is high,and the system operation efficiency is low.O&M has not yet achieved intelli-gent O&M,which is inefficient and costly,and lacks the management and evaluation of the whole life cycle of equipment.Facing the vision and goal of carbon peak and carbon neutrality,this paper studies the whole scenario and life cycle logical integrated planning method for the overall planning of the"low-carbon"target network,and builds a low-carbon planning method for the whole scenario and life cycle around the base station and computer room,and continuously evolves to the goal of green and low�carbon infrastructure,so as to provide strong support for the continuous reduction of comprehensive energy consumption and the comprehensive green and low-carbon transformation and development of the economy and society.
分 类 号:TN929.5[电子电信—通信与信息系统]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7