检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐启明[1] XU Qi-ming(Hubei Chemical Fertilizer Yichang Branch,SINOPEC,Zhijiang Hubei 443200,China)
机构地区:[1]中国石化湖北化肥宜昌分公司,湖北枝江443200
出 处:《化肥设计》2023年第6期62-64,共3页Chemical Fertilizer Design
摘 要:目前各火力发电机组普遍采用具有中间再热的回热循环,以提高锅炉、汽机整个机组的热经济性。高压给水加热器是回热系统的重要设备,由于设计、安装、检修和运行等方面原因,造成高加泄漏率很高。本文通过对两台2.5MW机组高压给水加热器管系的轴向应力和热应力分析,提出了控制好高压给水加热器启停及运行时的温度变化观点,解决了高压给水加热器泄漏频繁的问题。At present,the regenerative cycle with intermediate reheating is widely used in all thermal power generation units to improve the thermal economy of the whole boiler and turbine unit.High pressure feed water heater is an important piece of equipment in the heat-regenerative system,and it features a high leakage rate due to design,installation,maintenance and operation reasons.Through analysis of piping axial and thermal stress of two 2.5MW units of high pressure feed water heaters,this paper puts forward the point of controlling the temperature change during the start,stop and operation of high pressure feed water heaters,and solves the problem of frequent leakage of high pressure feed water heaters.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.17.74.181