伊敏露天矿采掘台阶高度优化研究  

Study on the height optimization of mining steps in Yimin Open-pit Mine

在线阅读下载全文

作  者:胡鹏飞 李月强 HU Pengfei;LI Yueqiang(Yimin Open-pit Mine,Huaneng Yimin Coal and Electricity Co.,Ltd.,Hulunbei’er 021134,China)

机构地区:[1]华能伊敏煤电有限责任公司伊敏露天矿,内蒙古呼伦贝尔021134

出  处:《露天采矿技术》2023年第6期5-7,共3页Opencast Mining Technology

摘  要:随着伊敏露天矿产能提高至35.00 Mt/a,采掘设备再次进行大型化升级。为了未来能够有效减少剥离台阶数量,降低开采强度以及采场空间,进而减少年剥离量,伊敏露天矿对台阶高度进行了研究。通过在电铲可采高度范围内对不同台阶高度的对比分析,最终确定将台阶高度调整至14 m。With the production capacity of Yimin Open-pit Mine increased to 35.00 Mt/a,the mining equipment was upgraded again.In order to effectively reduce the number of stripping steps,reduce mining intensity and stope space in the future,and then reduce the annual stripping amount,Yimin Open-pit Mine conducted a study on the height of the steps.By comparing and analyzing the height of different steps within the range of mining height of electric shovel,the height of the steps is finally determined to be adjusted to 14 m.

关 键 词:台阶高度 开采深度 推进度 剥离量 台阶数量 

分 类 号:TD824[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象