某开发区污水处理厂二期工程工艺设计  被引量:2

Process design for the second-stage project of a sewage treatment plant in development area

在线阅读下载全文

作  者:冯静娴 曹倩倩 刘晶晶 FENG Jingxian;CAO Qianqian;LIU Jingjing(East China Regional Center,China Machinery International Engineering Design&Research Institute Co.,Ltd.,Nanjing 210023,China)

机构地区:[1]中机国际工程设计研究院有限责任公司华东区域中心,南京210023

出  处:《工业用水与废水》2023年第6期71-75,共5页Industrial Water & Wastewater

摘  要:为某开发区污水处理厂二期扩建工程规模为3万m3/d,主要接纳该开发区内光伏企业及其他园区企业生产废水,根据进水水质和排水标准,设计采用除硬混凝沉淀池-Bardenpho生化池-高效沉淀池-反硝化深床滤池工艺,介绍了污水处理厂的工艺方案、主要构筑物设计参数和经济指标等。运行结果表明,出水各项指标均可达GB 18918—2002《城镇污水处理厂污染物排放标准》中的一级A标准,且ρ(F-)<3 mg/L,可为类似污水处理厂提供设计经验。The scale of the second-stage project of a sewage treatment plant in development area is 30000 m3/d,the component of its influent water is production wastewater from photovoltaic company and other companies in the said area.According to the influent water quality and relevant discharge standard,a combined process of hardness removal coagulation sedimentation tank-Bardenpho biochemical tank-high efficient sedimentation tank-denitrification deep bed filter was adopted in the design;besides,the technical scheme,main structures design parameters and economic indicators of the said sewage treatment plant were introduced.The operation results showed that,all the quality indicators of the effluent water met the requirement of level A grade 1 in GB 18918—2002 Discharge standard of pollutants for municipal wastewater treatment plant,ρ(F-)<3 mg/L,which could provide design experience for similar sewage treatment plants.

关 键 词:光伏产业 除氟 除钙硬度 污水处理厂 Bardenpho工艺 扩建工程 

分 类 号:X505[环境科学与工程—环境工程] X703.1

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象