检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨才 YANG Cai(Guangzhou Metro Design and Research institute Co.,Ltd.,510010,Guangzhou,China)
机构地区:[1]广州地铁设计研究院股份有限公司,广州510010
出 处:《建筑技术》2023年第23期2831-2834,共4页Architecture Technology
摘 要:以某零距离平行换乘车站为研究对象,通过三维有限元分析,对比不同工况下整坑开挖和分坑开挖方案对既有车站变形的影响规律。结果表明,分坑开挖方式可以有效减小既有车站结构的竖向位移和水平位移,对于保护要求等级高的建筑物和构筑物,邻近基坑可采用分坑开挖方式,为类似工程提供参考。Taking a zero distance parallel transfer station as the research object,through three-dimensional finite element analysis,the influence laws of whole pit excavation and sub pit excavation schemes on the deformation of the existing station under different working conditions were compared.The results show that the pit excavation method can effectively reduce the vertical and horizontal displacement of the existing station structure.For buildings and structures with high protection requirements,the pit excavation method can be adopted,which can provide reference for similar projects.
分 类 号:TV641.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49