检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王帅亮 陈川 宗秀金 钟世 刘春洋 万周全 WANG Shuai-iang;CHEN Chuan;ZONG Xiu-jin;ZHONG Shi;LIU Chun-yang;WAN Zhou-quan(Jiangsu Zhongnan Construction Industry Group Co.,Ltd.,226100,Nantong,Jiangsu,China)
机构地区:[1]江苏中南建筑产业集团有限责任公司,江苏南通226100
出 处:《建筑技术》2023年第23期2932-2935,共4页Architecture Technology
摘 要:苏州中南中心项目地下室为典型的大面积软土地基超深基坑,在施工过程中面临结构复杂、施工节点多样、各项工序衔接紧密、协调难度大、各流水段施工推演多变的问题,利用BIM技术通过展现、调整、再展现,生动形象地指导现场施工,保证了深基坑工程施工过程的安全高效。The basement of Suzhou Zhongnan Center Project is a typical large-area soft soil foundation and ultra-deep foundation pit.During the construction process,it faced complex structure,various construction nodes,close connection of various processes,difficult coordination,and variable construction deduction in each flow section.Using BIM technology to guide the on-site construction vividly and vividly through the use of BIM technology to ensure the whole process of construction of the deep foundation pit project safely and efficiently.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.62