缩短管母线安装时间  

Shorten the Installation Time of Pipe Busbar

在线阅读下载全文

作  者:齐泽力 QI Zeli(State Grid Jibei Beijing Power Transmission and Transformation Co.,Ltd.,Beijing Fangshan 102401,China)

机构地区:[1]国网冀北北京送变电有限公司,北京房山102401

出  处:《农村电气化》2023年第12期64-66,共3页Rural Electrification

摘  要:在变电站施工建设当中,管母线安装是很重要的一个环节,通常采用吊车和人工协同操作的方式来完成管母线的安装,耗费了很多人力物力,不方便且影响工作效率和工程进度。为了缩短管母线的安装时间,设计了一种管母线吊具,使用此吊具,能够加快施工进度,节省施工成本,提高经济效益。In the construction of substations,the installation of pipe busbars is a very important step.Usually,the installation of pipe busbars is completed through the cooperation of cranes and manual operations,which consumes a lot of manpower and material resources,is inconvenient,and affects work efficiency and project progress.In order to shorten the installation time of the tubular busbar,a tubular busbar hanger has been designed.Using this hanger can accelerate the construction progress,save construction costs,and improve economic benefits.

关 键 词:管母线 管母线吊具 缩短时间 

分 类 号:TM645.1[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象