作 者:彭峥 孔科 周顺文 张有山 PENG Zheng;KONG Ke;ZHOU Shunwen;ZHANG Youshan(PowerChina Chengdu Engineering Corporation Limited,Chengdu Sichuan 610072)
机构地区:[1]中国电建集团成都勘测设计研究院有限公司,四川成都610072
出 处:《四川水力发电》2023年第6期96-102,共7页Sichuan Hydropower
摘 要:在考虑白格堰塞湖影响下,对叶巴滩水电站施工导流规划进行动态调整研究。经过调整初期导流程序、实施分期围堰方案,保证了坝肩开挖工程尽早开工,降低了导流风险,挽回了工程损失;经综合经济技术比较,主体围堰推荐采用土石围堰结构型式,降低了工程投资,确保了主体工程施工顺利进行。This paper makes a study on the dynamic planning of construction diversion of Yebatan Hydropower Station under the influence of Baigeyansai lake event.The adjusted initial diversion program and a multistage cofferdam scheme have ensured the dam excavation to be started as early as possible,reducing diversion risk and recovering project losses.The earth-rock main cofferdam is recommended after a a comprehensive economic and technical comparison,reducing investment and ensuring the smooth construction of main project.
关 键 词:白格堰塞湖 叶巴滩水电站 导流程序 分期围堰 动态规划
分 类 号:TV732[水利工程—水利水电工程] TV735