检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈璨 王晶 于宗民 马原 王乙 范梁晨曦 丁然 李红权 CHEN Can;WANG Jing;YU Zongmin;MA Yuan;WANG Yi;FAN Liangchenxi;DING Ran;LI Hongquan(State Grid Jibei Electric Power Co.,Ltd.Electric Power Research Institute,Beijing 100045,China;Sichuan Energy Internet Research Institute,Tsinghua University,Chengdu 610042,China;Laboratory of Grid-Connected Operation and Demonstration Technology of Wind,Solar Storage,Beijing 100045,China;State Grid Jibei Electric Power Co.,Ltd.,Beijing 100045,China)
机构地区:[1]国网冀北电力有限公司电力科学研究院,北京100045 [2]清华四川能源互联网研究院,四川成都610042 [3]风光储并网运行与实证技术实验室,北京100045 [4]国网冀北电力有限公司,北京100045
出 处:《中国电力》2023年第12期9-19,共11页Electric Power
基 金:国家电网有限公司科技项目(高比例分布式光伏接入县域电网协同优化控制技术研究,52018K220015)。
摘 要:配网侧分布式资源的规模化发展加大了配网安全可靠供电保障难度。合理规划自治单元能以最小经济成本提升自治单元灵活性、供电安全可靠性以及消纳能力。然而现有的规划方法大多只考虑供电可靠性和经济性约束,未考虑资源相关性、调控模式以及电力市场因素,造成规划结果冗余及资源浪费。从自治单元的物理范围、容量规划影响因素、建模方法及求解算法4个方面进行综述分析,明晰自治单元的物理含义,分析源荷随机不确定性及相关性、调控模式、电力市场政策等因素对自治单元容量规划的影响,讨论考虑多因素的自治单元建模方法,比较不同规划求解算法的适用条件。最后,总结当前自治单元容量规划的不足,并提出相应建议及展望。The development of distributed power generation,new energy storage,and adjustable load on the distribution network side increased the difficulty of ensuring secure and reliable power supply.Rational planning of autonomous units can enhance flexibility,power supply security,and ability to integrate energy at the minimum economic cost.However,existing planning methods mostly consider constraints of power supply reliability and economic efficiency,without considering resource relevance,control modes,and electricity market factors,resulting in redundant planning results and resource waste.This paper reviewed and analyzed the physical scope of autonomous units,influencing factors of capacity planning,modeling methods and solving algorithms,clarifies the physical meaning of autonomous units,analyzes the influence of source-load random uncertainty and correlation,regulation mode,electricity market policy and other factors on autonomous unit capacity planning,discusses the autonomous unit modeling method considering multiple factors,and compares the applicable conditions of different solving algorithms.Finally,the shortcomings of the current autonomous unit capacity planning were summarized,and corresponding suggestions and prospects were proposed.This work is supported by Science and Technology Project of SGCC(Research on Synergistic Optimization and Control Technology for High Proportion of Distributed Photovoltaic Integration into County-level Power Grids,No.52018K220015).
关 键 词:自治单元规划 不确定性模型 调控模式 电力市场 求解算法
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200