检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林威 Lin Wei(Shenzhen Road&Bridge Group Co.,Ltd.,Shenzhen,China)
出 处:《科学技术创新》2024年第2期167-170,共4页Scientific and Technological Innovation
摘 要:为提高光明水厂净水处理综合体基坑支护的稳定性,将累计沉降变化值控制在最小范围内,开展对基坑支护施工技术的研究。采用土方分层分段的方法进行基坑土方开挖施工,选择钢筋混凝土灌注桩、高压旋喷桩以及搅拌桩相互咬合构成的支护结构,准备好适用于基坑支护的泥浆。最后,进行护筒的安装,在施工过程中进行旋挖成孔灌注桩操作,并完成清孔工作。实例应用证明,应用新的支护施工技术可以将累计沉降变化值控制在-5 mm~+5 mm范围内,充分满足该工程项目的支护施工要求,可有效提高光明水厂净水处理综合体基坑的稳定性。In order to improve the stability of the foundation pit support of the Guangming Water Treatment Complex,the cumulative settlement change value will be controlled within the minimum range,and research on the construction technology of foundation pit support will be carried out.The excavation of foundation pit earthwork is carried out using the method of layered and segmented earthwork.A support structure consisting of reinforced concrete pouring piles,high-pressure rotary spraying piles,and mixing piles is selected,and mud suitable for foundation pit support is prepared.Finally,the installation of the casing will be carried out,and during the construction process,the rotary excavation into a hole for pouring piles will be carried out,and the hole cleaning work will be completed.The practical application proves that the application of new support construction technology can control the cumulative settlement variation within the range of-5mm~+5mm,fully meeting the support construction requirements of the project,and effectively improving the stability of the foundation pit of the Guangming Water Treatment Complex.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.156.0