检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙晓薇 赵建军 刘芊 陈怀鑫 李汉卿 SUN Xiaowei;ZHAO Jianjun;LIU Qian;CHEN Huaixin;LI Hanqing
机构地区:[1]中国铁路北京局集团有限公司供电部 [2]中铁第六勘察设计院集团有限公司电气化设计院分公司
出 处:《电气化铁道》2023年第6期6-10,共5页Electric Railway
摘 要:近几年国内高速铁路牵引变电所陆续出现由于长期过载导致保护线断线,部分变电所地回流过大导致变电所地网发热以及腐蚀严重等问题。本文通过对供电系统及回流系统进行建模和仿真,分析既有分散回流接线方案存在的问题,提出了解决方案,并验证了方案的效果。In recent years,the broken of PW wire suffered from the long-term overload occurred subsequently in the traction substations of high-speed railways in China,and it leads to the problems of heating and severe corrosion of earthing network of substation as the ground return current passes through.The paper,on the basis of the established model and simulation,analyzes the existing problems of the scheme for decentralized return current wiring,puts forward the scheme for the solution.The effectiveness of the scheme is verified accordingly.
分 类 号:U223.6[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147