检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王许 王求华 WANG Xu;WANG Qiuhua(Pingxiang Water Resources and Hydropower Survey and Design Institute Co.,Ltd,Pingxiang 337000,China;Jiangxi Pingxiang Urban Development Service Center,Pingxiang 337000,China)
机构地区:[1]萍乡市水利水电勘测设计院有限公司,江西萍乡337000 [2]江西省萍乡市城镇发展服务中心,江西萍乡337000
出 处:《云南水力发电》2023年第12期353-357,共5页Yunnan Water Power
摘 要:通过对浙江省温岭市坞根镇革新塘闸进行初步选取闸室结构型式,分析计算发现闸室基底产生拉应力,不满足设计规范要求,后通过调整闸室结构,改善闸室受力情况,有效地消除了基底拉应力,满足了设计规范要求。经过对该水闸闸室设计的研究,剖析几种改善水闸闸室稳定与基底应力的方法。This paper preliminarily selects the structural type of Gexintang gate chamber in Wugen Town,Wenling City,Zhejiang Province.Through analysis and calculation,it was found that tensile stress was generated at the base of the gate chamber,which did not meet the requirements of the design specifications.After adjusting the structure of the gate chamber,the stress situation of the gate chamber was improved,effectively eliminating thebase stress and meeting the design specifications.After studying the design of the sluice chamber,this paper analyzes several methods to improve the stability and foundation stress of the sluice chamber.
分 类 号:TV662[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200