检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:廖忠稳 马伟栋 杨永信 LIAO Zhongwen;MA Weidong;YANG Yongxin(Guangdong Huadian Pingshi Power Generation Co.,Ltd,Lechang 512229,China;Power China Kunming Engineering Corporation Limited,Kunming 650051,China)
机构地区:[1]广东华电坪石发电有限公司,广东乐昌512229 [2]中国电建集团昆明勘测设计研究院有限公司,云南昆明650051
出 处:《云南水力发电》2023年第12期376-382,共7页Yunnan Water Power
摘 要:广东野猪山抽水蓄能电站水轮机工况发电水头变幅范围为446.9~517.2m,水泵工况抽水扬程变幅范围为457.6~522.9m,安装4台单机容量为300MW的立轴单级单转速混流可逆式蓄能机组。通过对抽水蓄能电站机组选型的介绍和剖析,对抽水蓄能电站水泵水轮机的选型设计进行了完整的总结。The variation range of the power generation head under the turbine operating condition of Guangdong Yezhushan Pumped Storage Power Station is 446.9~517.2m,and the variation range of the pumping lift under the pump operating condition is 457.6~522.9m.It installs four vertical shaft single stage single speed mixed flow reversible energy storage units with a single unit capacity of 300MW.Through the introduction and analysis of the selection of units in pumped storage power plants,this paper provides a complete summary of the selection and design of pump turbines in pumped storage power plants.
关 键 词:抽水蓄能电站 水头 扬程 水泵水轮机 机组选型设计
分 类 号:TV743[水利工程—水利水电工程] TK730.2[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.192