检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:别小飞 李广生 张青松 陈祖国 BIE Xiaofei;LI Guangsheng;ZHANG Qingsong;CHEN Zuguo(Henan Coalbed Mthane Development and Utilization Co.,Ltd.,Zhengzhou 450000,China;Henan Gas Control Research Institute Co.,Ltd.,Zhengzhou 450000,China;Xintian Coal Mine of Yonggui Energy Development Co.,Ltd.,Qianxi 551507,China;China University of Mining and Technology(Beijing),Beijing 100080,China)
机构地区:[1]河南省煤层气开发利用有限公司,河南郑州450000 [2]河南省瓦斯治理研究院有限公司,河南郑州450000 [3]永贵能源开发有限责任公司新田煤矿,贵州黔西551507 [4]中国矿业大学(北京),北京100080
出 处:《煤》2024年第1期35-41,共7页Coal
摘 要:针对碎软煤层瓦斯灾害频发、瓦斯抽采困难、顺煤层水平井钻进困难的问题,在借鉴“虚拟储层”思路和页岩气开发技术的基础上,以新田矿区9号煤层为对象,研究分析了煤层顶板L型水平井分段压裂抽采技术。通过目标区及目标层位优选、井身结构优化、井眼轨迹精准控制技术、多簇定向射孔分段压裂精确优化工艺技术及排采作业精细控制技术,形成了煤层顶板L型水平井煤层气高效抽采技术体系。结合工程实践,顶板L型水平井在新田矿区取得了产能突破,最高日产气量达到了5334 m^(3)/d,并获得了长期稳产高产的试验结果。顶板L型水平井分段压裂高效抽采技术的成功应用,为具有类似地质条件的高突矿井煤层气抽采及煤矿区瓦斯治理提供了技术方向引领。Aiming at the problems of frequent gas disasters in crushed and soft coal seams,difficulty in gas extraction,and difficulty in drilling horizontal wells along coal seams.Based on the method of"virtual reservoir"and the technology of shale gas exploitation.Taking No.9 Coal Seam in Xintian Coal Mine as the object,the staged fracturing drainage technology of L-type horizontal well in coal seam roof is studied and analyzed.The high-efficiency CBM extraction technology system of L-type horizontal well in coal seam roof is formed by the optimization of target area and target horizon,the optimization of wellbore structure,the precise control technology of wellbore trajectory,the precise optimization technology of multi-cluster directional perforation and staged fracturing,and the fine control technology of drainage operation.Combined with the application of engineering practice,the roof of L-type horizontal well has achieved a breakthrough in production capacity in Xintian Coal Mine,and the maximum daily gas production has reached 5334 m^(3)/d,the test results of long-term stable and high yield had been obtained.A technical direction leading is provided for CBM extraction and gas control in high outburst mines with similar geological conditions,which by the successful application of high-efficiency extraction technology of stage fracturing of L-type horizontal well in coal seam roof.
分 类 号:TE37[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229