Multifactor-influenced Reliability-constrained Reserve Expansion of Integrated Electricity-gas Systems Considering Failure Propagation  

在线阅读下载全文

作  者:Minglei Bao Xiaocong Sun Yi Ding Chengjin Ye Changzheng Shao Sheng Wang Yonghua Song 

机构地区:[1]the College of Electrical Engineering,Zhejiang University,Hangzhou 310027,China [2]the State Key Laboratory of Power Transmission Equipment and System Security at Chongqing University,Chongqing 400044,China [3]the State Key Laboratory of Internet of Things for Smart City,University of Macao,Macao 999078,China

出  处:《CSEE Journal of Power and Energy Systems》2023年第6期2236-2250,共15页中国电机工程学会电力与能源系统学报(英文)

基  金:the China NSFC under Grant 71871200;National Natural Science Foundation China and Joint Programming Initiative Urban Europe Call(NSFC-JPI UE)under grant 71961137004。

摘  要:With the increasing interactions between natural gas systems(NGS)and power systems,component failures in one system may propagate to the other one,threatening reliable operation of the whole system.Due to neglect of such cross-sectorial failure propagation in integrated electricity-gas systems(IEGSs),traditional economy-oriented reserve expansion models may lead to unreasonable planning results.In order to address this,an innovative reserve expansion model is proposed to determine the allocation of energy production components through the harmonization between costs and reliability.First,novel multifactor-influenced reliability indices are defined con-sidering synthetic effects of multiple uncertainties,including failure propagation,load uncertainties and generation failures.In reliability index formulation,contribution of failure propagation on system reliability is analytically expressed.To avoid high computational complexity,the fuzzy set theory is combined with conventional methods,e.g.,Monte-Carlo simulation technique to reduce numerous contingency states.Sampled contingency states are aggregated into several clusters represented by a fuzzy number.To effectively solve the planning model,a decomposition approach is introduced and applied to decompose the original problem into a master problem and two correlated reliability sub-problems.Numerical studies show the proposed model can plan reasonable reserves to guarantee reliability levels of IEGSs considering failure propagation.

关 键 词:Cross-sectorial 1 failure propagation fuzzy model integrated electricity-gas systems long-term reserve planning RELIABILITY 

分 类 号:TM31[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象