检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐锦宏 黄波林 聂邦亮 许凯凯 李滨[5] XU Jinhong;HUANG Boin;NIE Bangiang;XU Kaikai;LI Bin(Hubei Center of Geological Disaster Control,Wuhan 430034,China;Hubei Key Laboratory of Disaster Prevention and Mitigation,China Three Gorges University,Yichang 443002,China;School of Civil Engineering and Architecture,China Three Gorges University,Yichang 443002,China;Hubei Hydrogeology and Engineering Geology Brigade,Yichang 443002,China;Institute of Geomechanics,Chinese Academy of Geosciences,Beijing 100081,China)
机构地区:[1]湖北省地质灾害防治中心,湖北武汉430034 [2]防灾减灾湖北省重点实验室,湖北宜昌443002 [3]三峡大学土木与建筑学院,湖北宜昌443002 [4]湖北省水文地质工程地质大队,湖北宜昌443002 [5]中国地质科学院地质力学研究所,北京100081
出 处:《防灾减灾工程学报》2023年第6期1395-1404,共10页Journal of Disaster Prevention and Mitigation Engineering
基 金:国家自然科学基金项目(42077234)资助。
摘 要:三峡库区棺木岭危岩体基座岩体强烈劣化,稳定性持续下降,潜在涌浪灾害严重威胁九畹溪漂流景区和长江航道的安全。本文围绕棺木岭危岩体涌浪风险防控问题,开展了基于流固耦合数值模拟的危岩体涌浪危险性评估和涉水危岩体防治设计,研究表明:在景区旺季的145 m水位工况下,棺木岭危岩体失稳可能产生的涌浪最大高度约为19.2 m,在对岸九畹溪旅游码头最大爬坡高度约15.1 m,长江干流最大涌浪爬高约1.6 m,严重威胁约15 km的九畹溪航道和长江航道安全。针对危岩体处于偏心受压状态和消落区基座岩体劣化情况,对其下部凹腔进行“模袋砼围堰+岩腔填充”的工程防治设计,使得棺木岭危岩体稳定性系数从1.3提升至2.6。本次研究直接指导了棺木岭危岩体防治工程,可为库区其他涉水危岩体涌浪风险防控提供借鉴。The stability of the dangerous rock base of the Guanmuling in the Three Gorges Reservoir area continues to decline due to the severe deterioration of rock mass.Potential wave disaster induced generated by the rock mass collapse seriously threatens the safety of the Jiuwanxi drifting scenic spot and the Yangtze River waterway.This paper focuses on the risk assessment of dangerous rock wave and the prevention and control design of dangerous rock wave based on fluid-structure coupling numeri-cal simulation.The results show that:Under the condition of the reservoir water level of 145 m in tourism peak season,the maximum possible height of wave generated by the dangerous rock mass in-stability in Guanmuling is about 19.2 m,with the maximum ascending height of the Jiuwanxi tourism wharf on the opposite side of 15.1 m,and the Yangtze River of 1.6 m,which seriously threatens the safety of these waterway about 15 km.In view of the dangerous rock mass under eccentric compres-sion and the deterioration of the base rock mass in the fluctuation zone,the engineering prevention and control design of"bag concrete cofferdam+rock cavity filling"was carried out on the lower cavity of the dangerous rock mass,which increased the stability coefficient of the Guanmuling dangerous rock mass from 1.3 to 2.6.This study contributes directly to the prevention and control project of danger-ous rock mass in Guanmuling,also provides reference for the risk prevention and control of wave gere-rated by other dangerous rock masses in the reservoir area.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49