火电厂锅炉汽机联合试运转实施措施研究  

Study on the Implementation Measures of Joint Test run of Boiler Steam Engine in Thermal Power Plants

在线阅读下载全文

作  者:赵宇亮 Zhao Yuliang(Jinneng Holding Tashan Power Generation Co,Ltd,Datong Shanxi 037000,China)

机构地区:[1]晋能控股塔山发电有限公司,山西大同037000

出  处:《机械管理开发》2023年第12期234-235,238,共3页Mechanical Management and Development

摘  要:针对传统类型的火力发电模式不仅会对自然生态环境造成破坏,同样存在能源消耗过高的问题,为了进一步实现火电厂的可持续发展,遵循绿色发展理念,需要积极应用新型运营模式。基于此,针对火电厂锅炉汽机联合试运转实施措施开展专项研究与分析,希望能够进一步提升火电厂锅炉汽机联合应用水平。Traditional type of thermnal power generation mode will not only cause damage to the natural ecological environment,there is also the problem of high energy consumption,so in order to further realise the sustainable development of the thermal power plant,to fllow the concept of green development needs to actively apply a new mode of operation.Therefore,in order to further achieve the sustainable development of thermal power plants,fllowing the concept of green development requires the active application of new operation mode.Based on this,this paper focuses on thermal power plant boiler steam engine joint test run implementation measures to carry out special research and analysis,hoping to further enhance the thermal power plant boiler steam engine joint appliceation level.

关 键 词:火电厂 锅炉汽机 联合 试运转 实施措施 

分 类 号:TM621.2[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象