检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:祝学飞 杨坤 徐思旭 孙俊[1] 冯勇 席云飞 黄念义 ZHU Xuefei;YANG Kun;XU Sixu;SUN Jun;FENG Yong;XI Yunfei;HUANG Nianyi(CCDC Xinjiang branch,Korla,XinJiang 841000)
机构地区:[1]川庆钻探工程有限公司新疆分公司,新疆库尔勒841000
出 处:《钻井液与完井液》2023年第5期617-621,共5页Drilling Fluid & Completion Fluid
摘 要:ST2-4井是位于塔里木盆地桑塔木断垒带2号构造的一口侧钻井,其Φ152.4 mm井眼4350~4800 m井段井斜为0°~61.1°,中途完钻直推存储式测井过程中发生电测仪器被卡,井底50.95 m电测仪器无水眼通道,不能建立循环,第一次浸泡常规解卡液未解卡,第二次对常规解卡液配方改造升级为改进型解卡液,成功解卡,避免了超千万的电测仪器损失。改进型解卡液的改进措施包括:(1)将配制解卡液的清水替换浓度为10%的CaCl_(2)盐水;(2)将快速渗透剂快T的浓度提高至30%;(3)将解卡液密度提至高于井浆密度0.5 g/cm^(3),利用重力置换原理将解卡液置换至井底浸泡电测仪器。解卡后采用“低黏度切力轻浆+重稠浆段塞”携砂工艺保持井眼通畅,引入有机减阻剂YJJZ-1将常规KCl聚磺体系转换为低摩阻钻井液降低摩阻,通过提高HTHP泥饼质量、加强井浆防塌抑制性结合,完成了斜井段易黏卡井段电测、下套管作业。Well ST2.4 in 152.4 mm hole 4350~4800 m interval well deviation 0°-61.1°,in the process of the middle-completion direct-push memory logging,the electric logging tool got stuck,the non-water hole channel of the 50.95 m electric logging tool could not set up a cycle,and the conventional unstuck fluid did not get unstuck after the first immersion,for the second time,the formula of the conventional unblocking agent was upgraded to an improved unblocking agent.Firstly,the clean water of the unblocking agent was replaced with 10%CaCl_(2) salt water,and secondly,the concentration of the rapid penetrant fast T was increased to 30%,the third is to raise the density of the unblocking fluid to 0.5 g/cm^(3)above the mud density,and to replace the unblocking fluid to the bottom of the well by using the gravity replacement principle,thus successfully unblocking the electric measuring instrument,avoiding the loss of over ten million electric measuring instruments.The“Low viscosity,light slurry+heavy slurry slug”sand�carrying technology was used to keep the wellbore unblocked after the break-up,and the organic drag reducer YJJZ-1 was introduced to convert the conventional KCl polysulfonate system into the low friction drilling fluid to reduce the friction,through improving the quality of HTHP mud cake and strengthening the combination of anti-sloughing and inhibition of mud,the electric logging and casing running operations in the inclined section are completed.
分 类 号:TE254.3[石油与天然气工程—油气井工程] TE285
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43