检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:石涛 彭兢[1] SHI Tao;PENG Jing(Northwest Electric Power Design Institute Co.,Ltd.of China Power Engineering Consulting Group,Xi'an 710075,China)
机构地区:[1]中国电力顾问集团西北电力设计院有限公司,陕西西安710075
出 处:《电力勘测设计》2023年第S02期223-230,共8页Electric Power Survey & Design
摘 要:通过对一些太阳能热发电厂管线综合布置工程实践和国内外有关资料的研究,分析厂区管线综合布置中重点考虑的因素,分别针对塔式和槽式太阳能热发电厂的发电区和集热场,提出主要管廊分布和规划原则,进一步阐述太阳能热发电厂厂区特有的主要管线布置和敷设的具体要求,以达到满足工艺流程、节约用地、减少项目投资、方便施工维护的目的。Based on the research on the projects of comprehensive arrangement of pipelines in some solar thermal power plants at home and abroad,this paper analyzes the key factors considered in the comprehensive arrangement of pipelines in the plant,and puts forward the location and planning principles of pipe gallery in power block of the tower solar thermal power plant and parabolic trough solar thermal power plant.Furthermore,this paper expounds the specific requirements for the layout and laying methods of unique pipelines in solar thermal power plant,so as to meet the process flow,land conservation,investment saving and convenience for construction and maintenance.
关 键 词:太阳能热发电厂 管线综合布置 管廊 集热场 地下敷设 管架敷设
分 类 号:TM615[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43