长平矿五盘区煤层大巷过陷落柱支护技术研究  被引量:1

Research on Support Technology for the Coal Seam Main Roadway Passing Through Collapse Columns in the Fifth Panel Area of Changping Mine

在线阅读下载全文

作  者:史文龙 Shi Wenlong(Jincheng Hongsheng Jincheng Mine Construction Engineering Co.,Ltd.,Shanxi Jincheng 048000)

机构地区:[1]晋城宏圣金成矿山建筑工程有限责任公司,山西晋城048000

出  处:《山东煤炭科技》2023年第12期5-9,14,共6页Shandong Coal Science and Technology

摘  要:针对长平矿五盘区煤层大巷过陷落柱区域变形严重的问题,通过地应力测试、围岩强度测试、围岩结构窥视掌握了巷道围岩地质力学参数,分析了煤层大巷变形原因,针对性地设计了五盘区胶轮车巷过DX176陷落柱支护方案。现场试验表明,试验巷道整体变形不大,锚索受力处于合理的范围之内,满足了煤层大巷的使用要求,经济效益显著。In view of the serious deformation problem of the coal seam main roadway passing through the collapse column area in the fifth panel area of Changping Mine,the geological and mechanical parameters of the roadway surrounding rock are mastered through ground stress testing,surrounding rock strength testing,and surrounding rock structure observation.The reasons for the deformation of the coal seam main roadway are analyzed,and a targeted support scheme for the rubber wheel truck roadway passing through the DX176 collapse column in the fifth panel area is designed.The on-site test shows that the overall deformation of the test roadway is not significant,and the anchor cable stress is within a reasonable range,meeting the requirements for the use of the coal seam main roadway,with significant economic benefits.

关 键 词:煤层大巷 陷落柱 支护设计 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象