检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邢志强 Xing Zhiqiang(Zhongyang County Emergency Management Bureau,Shanxi Lüliang 033400)
出 处:《山东煤炭科技》2023年第12期170-175,共6页Shandong Coal Science and Technology
摘 要:为提高付家焉煤业10106综放工作面的顶煤回收率,首先对工作面支架上方顶煤的块度级配进行了现场实测,然后将测量结果引入数值模拟中,并分析了放煤厚度及放煤步距对顶煤放出量的影响,确定出合理的放煤厚度为2.5 m,采高为3 m,合理放煤步距为0.8 m。现场应用结果表明,采用优化的放煤工艺后,顶煤的平均回收率为86.5%,工作面平均回收率为90.41%,放煤效果较理想。In order to improve the recovery rate of top coal in the 10106 fully mechanized caving face of Fujiayan Coal Industry,on-site measurements are first conducted on the lumpiness grading of the top coal above the support of the working face.The measurement results are then introduced into numerical simulation,and the influence of coal caving thickness and step distance on top coal release amount is analyzed.A reasonable coal caving thickness of 2.5 m,a mining height of 3 m,and a reasonable coal caving step distance of 0.8 m are determined.The on-site application results show that after adopting the optimized coal caving process,the average recovery rate of the top coal is 86.5%,and the average recovery rate of the working face is 90.41%,indicating an ideal coal caving effect.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.219