检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:桑锦国 张进强 杨云鹏 陆宇超 张龙 姚凯 肖益盖 SANG Jinguo;ZHANG Jinqiang;YANG Yunpeng;LU Yuchao;ZHANG Long;YAO Kai;XIAO Yigai(Shandong Jinruan Science and Technology Co,.Ltd.;Dayingezhuang Gold Mine,Zhaojin Mining Industry Co.,Ltd.;Beijing Zhikuang Panshi Data Technology Co.,Ltd.;Sinosteel Maanshan General Institute of Mining Research Co.,Ltd.)
机构地区:[1]山东金软科技股份有限公司 [2]招金矿业股份有限公司大尹格庄金矿 [3]北京智矿磐石数据科技有限公司 [4]中钢集团马鞍山矿山研究总院股份有限公司
出 处:《现代矿业》2023年第12期163-169,共7页Modern Mining
摘 要:旋流器是矿山磨矿分级系统的重要设备,关系到选矿效率和质量。由于给矿泵池液位波动频繁,会出现生产指标频繁波动的情况,影响分级效率。通过大数据应用,发现传统旋流器分级控制方法存在的不足及原因,通过优化旋流器分级控制方法,保证了现场工况的持续稳定。应用数据建模与机理建模相结合,依托数据分析平台,实现了旋流器分级系统多维度数据模型支持下的现场参数优化,以及建立旋流器分级系统物理设备和工艺的数字化映射,更加真实反映了现场的工况,对各矿山选厂分级系统有广泛的借鉴意义。Cyclone is an important equipment of mine grinding classification system,which is related to the efficiency and quality of mineral processing.Due to the frequent fluctuation of the liquid level of the feed pump pool,the classification efficiency is affected,and the production index will fluctuate frequently.Through the application of big data,the shortcomings and causes of the traditional cyclone grading control method are found.By optimizing the cyclone grading control method,the continuous stability of the field conditions is ensured.By combining data modeling and mechanism modeling,relying on the data analysis platform,the field parameter optimization supported by the multi-dimensional data model of the cyclone classification system is realized,and the digital mapping of the physical equipment and process of the cyclone classification system is established,which more truly reflects the working conditions of the site,and has a wide range of reference significance for the classification system of each mine concentrator.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249