检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘磊磊[1] Liu Leilei(The Fifth Engineering Co.ltd.of China Railway 18th Bureau Group,Tianjin,100855,China)
机构地区:[1]中铁十八局集团第五工程有限公司,天津100855
出 处:《石家庄铁路职业技术学院学报》2023年第4期48-52,共5页Journal of Shijiazhuang Institute of Railway Technology
摘 要:液压自爬升模板系统在高墩桥梁施工过程中的安全性意义重大。以某一工程高墩液压自爬升模板系统为对象,采用有限元分析软件midas Civil 2015,分别对液压自爬升模板系统的荷载和施工工况进行计算和验算。研究表明:液压自爬升模板系统在施工工况、爬升工况和停工工况下均满足规范要求;施工单位在6级以上大风时应停止作业,并加强重点部位的锚固和墩柱四周爬模的连接,增强其整体稳定性。The safety of hydraulic self-climbing formwork system is very important in the construction of high pier bridge.Taking the hydraulic self-climbing formwork system of a high pier as the object,the finite element analysis software Midas Civil 2015 was used to calculate and check the load and construction conditions of the hydraulic self-climbing formwork system.The results show that the hydraulic self-climbing formwork system meets the requirements of the code under construction,climbing and shutdown conditions.The construction unit should stop the operation when the wind is above level 6,and strengthen the anchorage of the key parts and the connection of the climbing mold around the pier column to enhance its overall stability.
分 类 号:U445.46[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38