检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈宏坡 CHEN Hongpo
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海市200092
出 处:《城市道桥与防洪》2023年第12期5-9,M0004,共6页Urban Roads Bridges & Flood Control
摘 要:海南省G98环岛高速公路大茅隧道近年来交通拥堵状况越发凸显,交通事故发生率居高不下。从多个角度对现状大茅隧道存在的问题进行了调研,对规划三亚第二绕城高速公路与大茅隧道改扩建的关系进行了解读,并结合三亚市公路网规划和现场建设条件,对3个大茅隧道改扩建总体方案进行了比选论证,为高等级公路山岭隧道改扩建工程提供设计参考。In recent years,the traffic congestion in Damao Tunnel of the G98 Hainan Isle Ring Expressway has become increasingly prominent,and the traffic accident rate remains high.The existing problems of the current Damao Tunnel are investigated and surveyed from the multiple angles.The relationship between the planned Sanya No.II Ring Expressway and the reconstruction and extension of Damao Tunnel is interpreted.And combined with the highway network planning and the site construction conditions in Sanya,three overall schemes for the reconstruction and extension of Damao Tunnel are compared and demonstrated,which provides the design reference for the reconstruction and expansion engineering of mountain tunnels in the high-grade highways.
分 类 号:U412.37[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15