摘 要:近年来,随着国家经济的快速发展,城市基础设施建设突飞猛进,城市综合管廊的建设迎来了新的建设高潮,呈现出管廊建设层次不齐,管廊建设与周边工程建设时序错差,造成管廊外侧工程病害频发。通过对综合管廊两侧虚填造成道路塌陷的处理方案进行研究,对压力注浆法、强夯法、开挖分层填筑法三种处理方案进行比选,总结三种方案的适用性和经济性,为管廊道路塌陷的处理提供了有益的参考。In recent years,with the rapid development of the national economy,the construction of urban infrastructure has advanced by leaps and bounds,and the construction of urban utility tunnel has ushered in a new construction climax.But the construction level of utility tunnel is uneven,and the construction sequence of the utility tunnel with the surrounding projects is wrong,which cause the frequent engineering diseases outside the utility tunnel.The treatment scheme of road collapse caused by the false flling on both sides of the utility tunnel is studied.Three treatment schemes of pressure grouting method,dynamic consolidation and excavation placement method in layers are compared.The applicability and economy of the three schemes are summarized,which provide the useful reference for the treatment of road collapse of utility tunnel.
关 键 词:城市道路 综合管廊 塌陷 压力注浆法 强夯法 分层填筑法
分 类 号:U418[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.146.206.0