深中通道管节港内系泊动力响应试验研究(Ⅱ:双管节试验)  

Experimental study on dynamic response of Shenzhen-Zhongshan Link immersed tunnel element under mooring condition(II:double pipe joint test)

在线阅读下载全文

作  者:黄玉新 陈纯[2] 潘文博 欧阳群安 HUANG Yuxin;CHEN Chun;PAN Wenbo;OUYANG Qun′an(Institute of Water Science and Technology,Hohai University,Nanjing 211106,China;Tianjin Research Institute for Water Transport Engineering,National Engineering Research Center of Port Hydraulic Construction Technology,Key Laboratory of Engineering Sediment,Ministry of Transport,Tianjin 300456,China)

机构地区:[1]河海大学水科学研究院,南京211106 [2]交通运输部天津水运工程科学研究所港口水工建筑技术国家工程研究中心工程泥沙交通行业重点实验室,天津300456

出  处:《水道港口》2023年第5期712-718,共7页Journal of Waterway and Harbor

基  金:国家重点研发计划项目(2018YFC0809600,2018YFC0809602);广东省重点领域研发计划项目(2019B111105002);中央级公益性科研院所基本科研业务费专项资金项目(TKS20220103)。

摘  要:以深中通道工程海底隧道为依托,对管节在港内系泊防台开展物理模型试验,量测系缆力以及管节运动响应参数,探究管节在系泊状态下的动力响应特征及规律。研究主要结论有:环抱式港区内泊位系泊条件是对波浪掩护条件最好的位置最优,靠近口门的泊位最差;不同载况下,空载时风场的作用最显著而有沉放驳和测量塔的重载+工况下,风的作用力也要明显大于仅管节的重载情况,与管节半载时接近(重载+沉放驳+测量塔>重载);E32非标准管节系于突堤码头(GC1泊位)时,在各载况条件下,半载时的缆力相对最大,其中尼龙缆的最大张力为773 kN,钢缆的最大张力为1024 kN,不同载况下缆力大小的排序为半载>重载+沉放驳+测量塔>重载。Based on the Shenzhen-Zhongshan Link project,physical model tests were conducted on the mooring of pipe joints in the harbor to prevent the platform,and the bollard force and the motion response parameters of pipe joints were measured to investigate the characteristics and laws of the dynamic response of pipe joints under mooring condition.The main conclusions of the study are:The mooring conditions of berths in the ringed harbor area are optimal for the location with the best wave cover conditions,and the worst for the berths near the mouth;Under different loading conditions,the effect of the wind field is the most significant at no load,while the wind force is also significantly greater under heavy load+working conditions with a sinking barge and measuring tower than the heavy load condition with only pipe section,which is close to the pipe section at half load(heavy load+sinking barge+measuring tower>heavy load);When E32 non-standard pipe section is tied to the jetty(GC1 berth),the cable force at half load is relatively the largest under each load condition,in which the maximum tension of nylon cable is 773 kN and the maximum tension of steel cable is 1024 kN,and the cable force under different load conditions is ranked as half load>heavy load+sinking barge+measuring tower>heavy load.

关 键 词:管节系泊防台 波浪+风联合作用 缆绳张力 运动响应 

分 类 号:U65[交通运输工程—港口、海岸及近海工程] TV143[交通运输工程—船舶与海洋工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象