检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:查文华 梁译文 许涛 王荣荣 程文博 刘小虎 ZHA Wenhua;LIANG Yiwen;XU Tao;WANG Rongrong;CHENG Wenbo;LIU Xiaohu(School of Civil and Architectural Engineering,East China University of Technology,Nanchang 330013,China;Fengcheng Qujiang Coal Development Co.,Ltd.,Fengcheng 331136,China;School of Civil Engineering and Architecture,Anhui University of Science and Technology,Huainan 232001,China)
机构地区:[1]东华理工大学土木与建筑工程学院,江西南昌330013 [2]丰城曲江煤炭开发有限责任公司,江西丰城331136 [3]安徽理工大学土木建筑学院,安徽淮南232001
出 处:《煤炭工程》2023年第12期64-70,共7页Coal Engineering
基 金:国家自然科学基金项目(51964002,52264003);江西省“双千计划”支持项目(DHSQT22021002)。
摘 要:深部高应力巷道由于受到周围采空区、煤柱以及回采工作面的影响,往往处于极复杂的应力状态,呈现出各种变形破坏特征。以曲江煤矿-850 m西大巷为研究对象,通过现场调研、锚杆锚索受力监测、围岩变形监测等分析回采期间巷道的变形破坏形态,将采动下深部高应力巷道围岩变形破坏分为后方持续高压变形区和前方扰动动压变形区;依据采动下不同区的破坏形态,提出在后方持续高压变形区实施“三锚”联合支护技术,前方扰动动压变形区实施抗让结合的支护理念。通过对修复段的观察分析表明所确定的分区联合支护方案是合理、有效的能确保采动下深部高应力巷道长期稳定。Due to the influence of surrounding goaf, coal pillar and mining face, deep high stress roadway is often in a very complex stress state, showing various special failure characteristics. Taking the-850 m west roadway of Qujiang Coal Mine as the research object, the deformation and failure modes of roadway during mining are analyzed through field investigation, stress monitoring of bolt and anchor cable and deformation monitoring of surrounding rock. The deformation and failure of surrounding rock in deep high stress roadway under mining are divided into rear continuous high pressure deformation zone and front disturbance dynamic pressure deformation zone. According to the failure modes of different zones under mining, it is proposed to implement the ‘three anchors' combined support technology in the rear continuous high pressure deformation zone, and the support concept of combining resistance and yield in the front disturbed dynamic pressure deformation zone. The observation and analysis of the repair section show that the determined partition combined support scheme is reasonable and effective to ensure the long-term stability of deep high stress roadway under mining.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.173.146