检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张莉萍 ZHANG Liping(Nanjing Water Conservancy Planning and Design Institute Co.,Ltd.,Nanjing 210000,Jiangsu,China)
机构地区:[1]南京市水利规划设计院股份有限公司,江苏南京210000
出 处:《黄河水利职业技术学院学报》2024年第1期12-17,共6页Journal of Yellow River Conservancy Technical Institute
摘 要:自然灾害的频发和气候变化使堤防抢险工作面临着越来越严峻的挑战。分析了堤防渗水、管涌、流土、漏洞等常见险情及导致各类险情的原因,根据抢险工作前堵后排的思路,提出了这几种常见堤防险情的应急处理措施,探讨了抢险时的注意事项。针对某圩区堤防险情,制订了一套综合抢险方案,并采用高密度电法对该堤防出险段进行整体探查,论证抢险方案的有效性。With the frequent natural disasters and the impact of climate change,the dike rescue is facing more and more severe challenges and dangers.It analyzes the common danger of dike such as seepage,piping,loose soil,loophole and the causes of all kinds of danger.According to the idea of blocking before and after the rescue work,it puts forward the treatment measures of these common dike dangers,and discusses the matters for attention in the rescue work.Based on the dike danger in a polder area,a set of comprehensive rescue plan is formulated,and high-density electrical method is used to investigate the whole section of the dike and demonstrate the effectiveness of the rescue plan.
关 键 词:堤防防汛 抢险措施 渗水险情 管涌险情 流土险情 渗漏险情 整体探查
分 类 号:TV871.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.89.50