检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:牛利敏 严晶 Niu Limin;Yan Jing(Changjiang Survey,Planning,Design and Research Co.,Ltd.,Wuhan Hubei 430010,China)
机构地区:[1]长江勘测规划设计研究有限责任公司,湖北武汉430010
出 处:《山西建筑》2024年第3期187-190,共4页Shanxi Architecture
摘 要:结合我国北部某水库泄洪洞工作桥病害破损影响安全现状,找到了工作桥病害破损原因,分析了工作桥加固改造的必要性,在此基础上,提出两种加固改造设计方案,通过对两种方案的优点、缺点及投资比较分析,选择合理的加固改造方式确保水库的安全稳定运行。Based on the current situation of the damage to the working bridge of a spillway tunnel in a reservoir in northern China,the reasons for the damage were identified,and the necessity of strengthening and renovating the working bridge was analyzed.On this basis,two reinforcement and renovation design schemes were proposed.By comparing and analyzing the advantages,shortcomings,and investment of the two schemes,a reasonable reinforcement and renovation method was selected to ensure the safe and stable operation of the reservoir.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.112.164