检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张涛 ZHANG Tao(Shanghai Construction No.2(Group)Co.,Ltd.,Shanghai 200090,China)
出 处:《建筑施工》2023年第12期2423-2425,2467,共4页Building Construction
摘 要:基于太阳能光伏电池封装材料一期项目工程案例,针对体量大、工期紧、跨度大的项目特点,开展大跨度、大体量屋面三角桁架快速高精度施工技术研究,形成相应的技术措施及成套施工工艺,有效满足目前工业厂房体量大、工期紧、跨度大的发展要求。Based on the case study of the phase I project of solar photovoltaic cell packaging materials,in response to the characteristics of large volume,tight construction period,and large span projects,research is conducted on the rapid and high-precision construction technology of large span and large volume roof triangular truss,the corresponding technical measures and complete construction processes are formed,which effectively meet the development requirements of large volume,tight construction period,and large span industrial factories.
分 类 号:TU755[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.179