铁路桥钢横梁吊装施工技术要点  

在线阅读下载全文

作  者:刘振伟 

机构地区:[1]北京铁城建设监理有限责任公司,北京100038

出  处:《科技创新与应用》2024年第5期164-167,共4页Technology Innovation and Application

摘  要:钢横梁因自身施工特点对吊装施工工艺、施工技术和施工质量要求较高。该文以跨营运韩原铁路的某铁路特大桥为例,对钢横梁施工前吊装设备准备、技术方案设计等进行计算阐述,并从吊装施工的工期安排、试吊、正式吊装及永久固结框架墩等方面对钢横梁吊装施工技术要点进行探讨,保证施工安全、提高施工效率。旨在为类似工程施工提供参考。Steel crossbeam has higher requirements on hoisting construction technology,construction technology and construction quality because of its own construction characteristics.Taking a railway bridge running across Hanjialing-Taiyuan Railway as an example,this paper calculates and expounds the preparation of hoisting equipment and technical scheme design of steel crossbeam before construction,and discusses the key technical points of hoisting construction of steel crossbeam from the aspects of time limit arrangement,trial hoisting,formal hoisting and permanent consolidation of frame pier,so as to ensure construction safety and improve construction efficiency and provide reference for the construction of similar projects.

关 键 词:桥梁 钢横梁 吊装施工 施工技术 施工质量 

分 类 号:U445[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象