板桩码头力矩平衡式胸墙模板设计技术及应用  

Design technology and application of torque balanced breast wall formwork for sheet pile wharf

在线阅读下载全文

作  者:张定野 陈丛文 丁俊吉 ZHANG Ding-ye;CHEN Cong-wen;DING Jun-ji(No.5 Engineering Co.,Ltd.of CCCC First Harbor Engineering,Qinhuangdao,Hebei 066000,China)

机构地区:[1]中交一航局第五工程有限公司,河北秦皇岛066000

出  处:《中国港湾建设》2024年第1期50-54,共5页China Harbour Engineering

摘  要:板桩码头的结构形式在国外施工项目中日渐增多,码头的板桩墙与胸墙主要分为陆上施工与水上施工2种形式。陆上施工需要提前填筑围堰,施工措施费用较高且工期延长;水上施工胸墙工序繁琐且施工的安全风险较大、对工程的工期、质量造成一定影响。文章介绍了印尼奥比岛Persada 6B泊位项目的板桩码头胸墙工艺,该项目使用了力矩平衡式底模设计,通过悬吊底模并整体安装的施工工艺,避免了水下焊接作业,且对施工期间的底模力矩平衡条件进行了分析计算,工艺经过项目实践得以顺利实施。The structural forms of sheet pile wharves are increasing in foreign construction projects,and the sheet pile walls and breast walls of wharves are mainly divided into two types:onshore construction and over-water construction.Onshore construction requires early filling of cofferdams,which incurs high construction costs and prolongs the construction period;the over-water construction process of the breast wall is complicated and the construction safety risk is large,which has a certain impact on the project schedule and quality.This paper introduces the process of sheet pile pier breast wall for the Persada 6B berth project in Obi Island,Indonesia.The project uses a torque balanced bottom formwork design,which avoids underwater welding operations by suspending the bottom formwork and installing it as a whole.The torque balance conditions of the bottom formwork during construction are analyzed and calculated,and the process is successfully implemented through project practice.

关 键 词:板桩码头 胸墙底模 整体安装 平衡模板 

分 类 号:U655.4[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象