检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张国宗 牟晓丽 ZHANG Guozong;MU Xiaoli(School of Economics and Management Engineering,Beijing University of Civil Engineering and Architecture,Beijing 102600,China)
机构地区:[1]北京建筑大学城市经济与管理学院,北京102600
出 处:《工程管理学报》2023年第6期74-79,共6页Journal of Engineering Management
摘 要:为提高医院建设项目投资概算的准确性,将研究视角聚焦在初步设计阶段,基于灰色关联法和系统动力学理论,识别出影响医院概算的关键因素,建立了指标体系和模型。通过因果关系图和流图,揭示了医院建设项目投资概算的形成与影响机制。并以两个案例进行对比分析,验证了模型的有效性和准确性。为医院建设项目的概算编制、投资决策和概算批复提供了新的思路和依据。To improve the accuracy of the investment estimate of hospital construction,this paper focuses on the preliminary design stage,identifies the key factors affecting the hospital's estimate based on the gray correlation method and system dynamics theory,and establishes the index system and model.The causality diagram and flow diagram reveal the formation and influence mechanism of the investment estimate of hospital construction.In this paper,two cases are compared and analyzed to verify the validity and accuracy of the model.This research provides new ideas and bases for the preparation of budget estimates,investment decision-making,and approval of budget estimates for hospital construction projects.
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13